Worcester 18/25 Instruction Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
ELECTRICS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25
8 716 106 256C (03/2010)
27
INSTALLATION
ELECTRICS
DANGER - 230V:
ISOLATE THE MAINS ELECTRICITY
SUPPLY BEFORE STARTING ANY
WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS.
IMPORTANT: OBSERVE ELECTRONIC
STATIC DISCHARGE PRECAUTIONS.
DO NOT TOUCH THE PCB CIRCUITS.
Access to 230V connections:
1Release scews (B) and remove cover panel
(C) from control box (A).
2Release screw (D) from cable clamp (E).
Pull inner clamp part (F) outwards.
Feed sufficient power cable (G) through the
cable clamp (E) and secure grip with screw (D).
Separate wires from cable end and strip to 6mm.
230V connections:
3Connect SWITCHED LIVE wire (Brown) to
terminal L.
Connect NEUTRAL wire (Blue) to
terminal N.
Connect EARTH wire (Green/Yellow) to
the terminal .
Route the power cable to the external connection
point avoiding any potentially hot surfaces
allowing sufficient cable to pivot the control box
into the service position. Open the control box
into the service position to check the cable length
and routing.
Any external device connected to the
boiler must take its power supply from
the boiler only and must NOT have a
separate supply.
See the following pages of electrical
diagrams for details of different systems.
Refit electric control panel cover:
Refit cover panel (C) to control box (A)
and secure with screws (B).
8 716 106 256 C 03.10 30/3/10 14:24 Page 27
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 51 52

Comments to this Manuals

No comments