Worcester 18/25 Instruction Manual Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
Combustion chamber:
1 Remove the retaining nuts and washers (B).
Remove combustion chamber access
door (A).
2 Ensure the baffles (C) and baffle retainer
(D) are correctly fitted for the boiler output
as shown in the plan views below.
3 Refit combustion chamber door (A).
IMPORTANT: Secure with nuts and
washers (B) and tighten, using the
sequence shown in figure 3a, until the
chamber door is firmly secured, do not
over tighten the nuts.
4 Unscrew screws (E) and remove flue
manifold access cover (F).
5 Check that all the baffles (G) and baffle
retainer (H) are correctly fitted to the
secondary heat exchanger.
COMBUSTION CHAMBER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25
8 716 106 256C (03/2010)
23
INSTALLATION
COMBUSTION CHAMBER
1
3
2
4
3a
FRONT
8 716 106 256 C 03.10 30/3/10 14:24 Page 23
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 51 52

Comments to this Manuals

No comments