Worcester DANESMOOR Instruction Manual

Browse online or download Instruction Manual for Water heaters & boilers Worcester DANESMOOR. Worcester DANESMOOR Instruction manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
INSTRUCTION MANUAL
INSTALLATION COMMISSIONING
& SERVICING
GB
GREENSTAR DANESMOOR WALL MOUNTED
12/18 & 18/25
WALL MOUNTED OIL FIRED CONDENSING BOILER
CONVENTIONAL FLUE & ROOM SEALED FLUE
FOR FULLY PUMPED OPEN VENT OR SEALED CENTRAL HEATING SYSTEMS AND DOMESTIC
HOT WATER CYLINDERS
THE APPLIANCE IS FOR USE WITH KEROSENE (28 SECOND
OIL) ONLY
INSTRUCTION MANUAL
GB
THE APPLIANCE IS FOR USE WITH KEROSENE (28 SECOND
OIL) ONLY
Page view 0
1 2 3 4 5 6 ... 59 60

Summary of Contents

Page 1 - 12/18 & 18/25

INSTRUCTION MANUALINSTALLATION COMMISSIONING& SERVICINGGBGREENSTAR DANESMOOR WALL MOUNTED12/18 & 18/25WALL MOUNTED OIL FIRED CONDENSING BOILER

Page 2 - Check List

OIL SUPPLYOIL SUPPLY :• This appliance is suitable for kerosene (28 second oil) only, no other fuel must be used.• Plastic or steel tanks should be in

Page 3 - CONTENTS

RTYPICAL OPEN VENT SYSTEM:A - Appliance.B - Expansion vessel.C - Automatic bypass valve.D - Drain cock.E - Feed and expansion cistern.F - Feed and exp

Page 4

WATER SYSTEMS & PIPEWORKFILLING PRIMARY SEALED SYSTEMS:• Filling the system must comply with one of the methods shown opposite.• The filling point

Page 5

CONDENSATE PIPEWORKCONDENSATE PIPEWORK:• All national and, where appropriate, local regulations for the discharge and neutralisationof condensate shou

Page 6 - TECHNICAL DATA

PRESSURE RELIEF PIPEWORKIMPORTANT: The pressure relief valve is asafety device for the boiler and if activated maydischarge boiling water or steam thr

Page 7 - LAYOUT & COMPONENTS

• This boiler is only suitable for installing internally within a property at a suitable location onto a fixed rigid vertical non combustable sur

Page 8 - CLEANING PRIMARY SYSTEMS

600mm2250mm600mm750mm1 12323A0600mm2250mm600mm radius750mmAA - Bath or shower cubicle (zone 0)1 122303BOILER LOCATION &CLEARANCESCOMPARTMENTS:Foll

Page 9 - MAINS SUPPLY

Minimum dimensions of flue terminal positions for oil fired appliances:TERMINAL POSITION

Page 10 - OIL SUPPLY

CONVENTIONAL FLUECBADEA - BoilerB - FlueC - Max. 2 bends at 135°D - Anti down-draught terminalE - Chimney• Open (conventional) flued appliances must n

Page 11 - WATER SYSTEMS & PIPEWORK

ROOM SEALED FLUE OPTIONSThe diagrams (opposite) show the componentsused and the maximum flue length (L) foreach flue configuration.In all cases L is m

Page 12

INSTALLATION &SERVICING INSTRUCTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718

Page 13 - CONDENSATE PIPEWORK

Unpacking:It is advised that two or more persons are involvedin the transfer of the packaged boiler from the vanto the point of delivery.1 Once the p

Page 14 - PRESSURE RELIEF PIPEWORK

All removed parts must be placed safely awayfrom the working area until required in orderto avoid a potential tripping or slippinghazard.At all times

Page 15 - CLEARANCES

INSTALLATIONUNPACKING THE BOILERINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a

Page 16 - 8 718 681 134a (08.08)

All packaging must be placed safely awayfrom the working area in order to avoid apotential tripping or slipping hazard.At all times the correct method

Page 17 - FLUE TERMINAL POSITIONS

SAFETY:All relevant safety precautions must be undertaken.Protective clothing, footwear, gloves and safetygoggles must be worn as appropriate.PIPEWORK

Page 18 - CONVENTIONAL FLUE

24INSTALLATIONBOILER INSTALLATION Drill the 6 mounting holes (the wall bolts require 10mmØ x 90mm hole depth), the pipe fitting bracket fixing hole (

Page 19 - ROOM SEALED FLUE OPTIONS

Combustion chamber:3 Check all the baffles (A), baffle retainers(B) and restrictor plates (C) are correctly fitted, (they may have moved during

Page 20 - UNPACKING THE BOILER

IMPORTANT: The boiler is not designed totake the weight of the flue system, this mustbe supported externally to the boiler.Grease the vertical adaptor

Page 21

CAUTION: ISOLATE THE OIL, WATER &ELECTRICAL MAINS SUPPLIES BEFORESTARTING ANY WORK AND OBSERVE ALLRELEVANT SAFETY PRECAUTIONS.OIL BURNER:1 Check

Page 22

Adjust position of air damper discs to suitburner output (see chart below), located asabove. Access by removing the two star screws (SC) to release th

Page 23

SAFETY & REGULATIONSIMPORTANT INFORMATION AND SYMBOLS 1SAFETY PRECAUTIONS AND INSTALLATION REGULATIONS 3APPLIANCE INFORMATIONGENERAL INFORMATION

Page 24 - 188 above

2REFITTING COMPONENTS2 Lift electrical control box (A) back onto thesupporting bracket (B). Locate the control box bracket at the rear aand secure

Page 25 - BOILER INSTALLATION

1= EARTH = LIVE= NEUTRALAAAFDC352BCGH 7 8 9 10 5 6 7 8 9 10N1 N2 1 2 3 4 5 6 230V4ECHDHWExternal 230Vprogrammer

Page 26 - COMBUSTION CHAMBER

BCD= EARTH = LIVE= NEUTRALRiello BurnerMNL1 2 3 4 5 61 2 3 4 5 6A(C)(1)IGN1 N2 1 2 3 4 5 6 7 8 9 10FHMNEKLJELECTRICS230V STANDARD WIRI

Page 27 - CONDENSATE TRAP

ELECTRICS = EARTH • = LIVE • = NEUTRAL • = SWITCHED LIVE7 8 9 10FH2 PORT3 PORTOHOT WATER OFFHOT WATER ONHEATING ONINSIDE BOILEROUTSIDE BOILERPGN1 N

Page 28 - * (on 12/18 model only)

ELECTRICS7 8 9 10FHOINSIDE BOILEROUTSIDE BOILERGN1 N2 1 2 3 4 5 6 = EARTH • = LIVE • = NEUTRAL • = SWITCHED LIVEDANGER - 230V:ISOLATE

Page 29 - 12/18

ELECTRICS = EARTH • = LIVE • = NEUTRAL 7 8 9 10FH2 PORTINSIDE BOILEROUTSIDE BOILERPGN1 N2 1 2 3 4 5 6 UQTC21SBlueBrownRBlueBlueGreyYel

Page 30 - REFITTING COMPONENTS

ELECTRICSDANGER - 230V:ISOLATE THE MAINS ELECTRICITY 3 PORT VALVE CONTROL SET:Key to components:R - ROOM THERMOSTAT.S - CIRCULATING PUMP.F - INTERNA

Page 31 - ELECTRICS

14325PRE-COMMISSIONING CHECKS -APPLIANCECAUTION: ISOLATE THE MAINS ELECTRICALSUPPLIES BEFORE STARTING ANY WORKAND OBSERVE ALL RELEVANT SAFETYPRECAUTIO

Page 32 - 1 2 3 4 5 6

1 Open all system and radiator valves. Turn on the water main stop cock. Open vented systems only:  Turn on the water to the system feed and expan

Page 33

A - Bleed & pressure gauge portB - Pressure adjustmentC - Vacuum gauge portD - Retaining screws - coverCBADRIELLORDB OIL PUMPBURNER LOCKOUT RE

Page 34

SAFETY PRECAUTIONS& INSTALLATION REGULATIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/

Page 35 - 7 8 9 10

%CO2NOZZLEBoiler 12/18 RDB 1 OIL PUMPPRESSURE(p.s.i.)FUELFLOW RATEKg/h l/hAPPROX.FLUE GASTEMP °CAPPROX.AIRSETTINGINPUT OUTPUTkW kW0.40 60°ES0.45 6

Page 36

STARTING THE APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)40

Page 37 - CHECKS - APPLIANCE

31WATER TREATMENTIMPORTANT: Debris from the system candamage the boiler and reduce efficiency. Failure to comply with the guidelines for the use of wa

Page 38 - FILLING THE SYSTEM

FINISHING COMMISSIONING - APPLIANCE1Locate the top rear edges of panel (A ) onto the supporting tabs ( B ) and drop the front panel carefully into po

Page 39 - STARTING THE APPLIANCE

INSPECTION AND SERVICE1AECDBG2INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18

Page 40 - APPLIANCE

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)44

Page 41

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)45

Page 42 - WATER TREATMENT

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)46

Page 43 - FINISHING COMMISSIONING

BAFFLE ARRANGEMENT 18/2518/25 MODEL SHOWNBAFFLE ACCESS DOORBAFFLE RETAINERRemove and fit through baffle access door.BAFFLE3 for 18/25 models, fitted i

Page 44 - INSPECTION AND SERVICE

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)48

Page 45

GENERAL INFORMATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)4APPL

Page 46

SHORT PARTS LIST 12/1878111516171312142345691017a1819 201 Burner - Riello RDB 1 12/18 HEPart Number: 8 718 681 015 0 2 Combustion head - LD2X SH12/1

Page 47 - BAFFLE ARRANGEMENT 12/18

SHORT PARTS LIST 18/25INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)50

Page 48 - BAFFLE ARRANGEMENT 18/25

FAULT FINDING& DIAGRAMSFAULT FINDINGINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718

Page 49

FAULT FINDINGINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)52FAULT FIN

Page 50 - SHORT PARTS LIST 12/18

FAULT FINDING& DIAGRAMSFAULT FINDINGINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718

Page 51 - SHORT PARTS LIST 18/25

Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Lockoutwithin 1second?Replacecontrol boxReplacemotor/pumpCheck boilercontrols &s

Page 52 - BURNER FUNCTION

MO535 RDB CONTROL BOX OPERATIONThis operation instruction is provided to assist competent and suitably qualified engineers tolocate and rectify faults

Page 53 - HEATING/ HOT WATER

SERVICE INTERVAL RECORD It is recommended that the heating system is serviced regularly andthat you complete the appropriate Service Interval Record o

Page 54 - BOILER FUNCTION

SERVICE 1DATEENGINEER NAMECOMPANY NAMETEL No.OFTEC REG No.PUMP PRESSURE: psi CO2%:NOZZLE CHANGED? YES NOF.G.T. °C

Page 55 - MO535 RDB CONTROL BOX

NOTESNOTESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)58NOTES

Page 56 - CONTROL BOX OPERATION

TECHNICAL DATAINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)5TECHNICAL

Page 57 - OIL BOILER COMBUSTION RECORD

In the unlikely event the boiler does not givecomplete satisfaction, before calling for aservice engineer, the installer should checkthe following:-Ge

Page 58

LAYOUT & COMPONENTSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/258 718 681 134a (08.08)6

Page 59

CLEANING PRIMARY SYSTEMSBEFORE CLEANING THE SYSTEM:ENSURE THE SYSTEM AND PIPEWORK ISIN GOOD WORKING ORDER.FLUSH THE EXISTING SYSTEM WITH APOWER FLUSHI

Page 60 - CONTACT INFORMATION

MAINS SUPPLYELECTRIC SUPPLY:• Supply: 230V - 50Hz.• Cable: PVC insulated 0.75mm2(24 x0.2mm) temperature rated to 90°C.• Protection IP20.• External

Comments to this Manuals

No comments