Important: bathroom locations and clearances
•
The boiler must not be installed in Zone 1
•
Any switch or appliance control using mains electricity
must not be within reach of a person using the bath
or shower
•
Electrical switches (other than pull cords), fused spurs
and socket outlets must not be situated in the bathroom
•
A boiler fitted with a mechanical timer or RF mechanical
timer (receiver) or FW100 controller may only be installed
outside the shaded area. A boiler with any other timer
fitted (or blanking panel for an optional programmer) can
be installed in zone 2.
•
Additional Residual Current Device (RCD) protection may
be required.
Refer to the latest IEE wiring regulations.
2*
Radius 600mm
Radius
600mm
2
1
2
2
2
1
2
2
2
1
600mm
600mm
600mm
750mm
2,250mm
2,250mm
2*
*Without the end wall, zone 2 must extend 600mm from the bath.
Radius 600mm
Radius
600mm
2
1
2
2
2
1
2
2
600mm
2
1
2
600mm
600mm
600mm
750mm
2250mm
2250mm
Site preparation/portability
Greenstar Highflow CDi appliances are supplied with a
floor mounted pre-plumbing jig. The jig enables all gas and
water services to be pre-plumbed and tested prior to fitting
the boiler.
For ease of installation the appliance has a roll-in boiler tray
which allows it to be rolled into place once the connections
have been made.
Casing dimensions
850mm
600mm†
600mm
†630mm to front of flap.
Pipework connections
A
B
C
D
E
Pipework connections
A Central heating flow 22mm
B DHW flow 22mm
C Gas inlet 22mm
D Cold main inlet 22mm
E Central heating return 22mm