Worcester 18/25 User Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
CONTROLS
GREENSTAR UTILITY 18/25
8 716 106 257b (03.2010)
A Temperature control (behind front top panel).
B Burner lockout indicator/reset button (on burner control box, under top panel).
C Reset button - flue overheat thermostat (on control box, behind front panel).
D Reset button - boiler overheat thermostat (on control box, behind front panel).
E Front panel.
F Top panel.
G Front top panel.
Removal of panels.
To remove front panel (E) pull bottom
of panel away from the base and lift
to remove. To replace, realign ball
studs and push back into place.
Always keep pressure to the edges of
the panel to avoid accidental damage.
To remove top panel (F) pull panel
squarely upwards to remove.To
replace, realign ball studs and push
back into place.
To remove top front panel (G) pull
panel forwards to remove.To replace,
realign ball studs and push back into
place.
CONTROLS
USING YOUR
BOILER
3
8 716 106 257b 30/3/10 14:26 Page 5
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 19 20

Comments to this Manuals

No comments