Worcester 18/25 Installation Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
GENERAL INFORMATION
INSTALLATION & SERVICING CLEARANCES
FRONT
FRONT
BASE
PLAN
VIEW
PLAN
VIEW
2500mm*
2500mm*
2500mm*
600mm
600mm
min.
600mm
600mm
150mm
10mm
10mm
85mm
The same applies for right hand
flue installation where right and
left clearances are mirrored.
LOCATION & CLEARANCES
WARNING:
External equipment operating at 230 Volts
must not be serviced during adverse weather
conditions.
Do not use pressure washers or steam
cleaners on this boiler or cabinet.
FUEL:
This boiler is designed to use kerosene, no other
fuel may be used.
BOILER LOCATION:
WARNING:
Never allow the flue terminal or air inlet to
become obstructed by plants or any other
objects.
The cabinet is not load bearing, and only
provides weather protection for the boiler inside.
There must be sufficient hard standing and
access around the boiler for servicing.
*See Installation manual for further details.
FRONT
GREENSTAR HEATSLAVE EXTERNAL 12/18 - 18/25 - 25/32
8 716 113 390e (03.2010)
11
MAINTENANCE
8 716 113 390e 30/3/10 14:05 Page 13
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19 20

Comments to this Manuals

No comments