Worcester GREENSTAR 30 HE Service Manual Page 37

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 36
6 720 611 400 GB (03.11)
Maintenance
37
9.2 Description of servicing operations
The combustion performance must be checked before
and after any servicing work on the combustion and
burner components. Refer to section 8.2.
Checking the ionisation current,
Service Function 3.3
B Select Service Function 3.3. (See page 30 Display-
ing Service Functions”)
If the display shows ‘Meduim’ or ‘High’ while the boiler
is firing, the ionisation current is OK. If the display
shows ‘No’ or ‘Low’ while the boiler is firing, the elec-
trode assembly (32.1, page 6) must be cleaned or
replaced.
Domestic hot water
If, after checking the dynamic pressure, the flow rate is
too slow:
B remove the domestic hot water heat exchanger and
replace,
B Before removing the heat exchanger shut the inlet
valve and drain the hot water circuit.
B Use new seals when replacing the heat exchanger.
Fig. 44
Primary Heat exchanger
There is a special accessory kit (no. 840) for cleaning
the heat exchanger, order no. 7 719 001 996.
B Check control pressure on the air - gas mixer unit at
max. rated heat output using an electronic manome-
ter.
Fig. 45
B Remove cleaning access cover (415, page 6) and
the metal plate below it, if present. Refer to fig. 2.
B Unscrew condensation trap and place suitable con-
tainer underneath. Refer to fig. 46.
B Remove the fan and the burner as described in the
text headed “Burner” (see page 38).
Fig. 46
7 181 465 330-06.1R
i
The heat exchanger should only be
cleaned if the control pressure is
5.2 mbar (R30 HE plus)
5.3 mbar (R35 HE plus)
6.2 mbar (R40 HE plus)
(depression) or less.
6 720 610 332-69.1R
6 720 610 332-72.1R
Page view 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 51 52

Comments to this Manuals

No comments